Steel structure space frame installation project case

Steel structure grid installation

f06b2b9623c619c75832057d6b2e5ac

e77d4a5d97147c3b8b78418a553cad8 ca9fc2e9c77ccf2183b78b00b213600

0989b50db83309eb4641868b05e1bbf 853a33f2e7e733cf128e2b2e7ee0760

Steel structure grid installation construction video

2fb9b92926167597a0dcfba656c82ba ae96c3c3fbae4e6a6b168afbc1d0535

52717771f678f405e3753bdd9080907 3469e088951db2939ce85f6ed9245e6

acd4d37c1e359af152890ba9a7e0e80   879341ac3c0fd6da0fac56cc44718b4   880094a59f280c4719f93f57ec385d9

96590f4fd9fa65085f246665442e276  d30997bb9c7f0eb91137a996c171a57   0894b37836999f837c1e93ac211ff71

695c050f755399707bb8e02121eb28f   59ed9a33280f640102da308acc8d3c8   9b054b689af4669c629b6bd157b0882

4e9c9cdd903677ef1866c3c24a6b5c6    fcac1becb27e1023177abdb30b8102e   c6b12e0706394e4c135ef1ccd1f751e

a1cc0dfaac1155d7945aa15fce92ae2    1771393d64ec41daf43185fc3bf3607   945ea348641c53ec1c612c25beaf24a

fb0879627747704c97b63440d1ee652      d261b27c0407b0ec2416c5e15fabad6

General manager shang ruida

Tel: 17626466881

Email:sales@china-steel-truss.com

Website:https://www.china-steel-truss.com

we can chatt on whatsapp,my id is 19895251112

Brief introduction of jacking-up technology for installation of Prune grid and on-site photos

Hydraulic synchronous jacking construction method is a new construction technology. The steel structures such as space truss and pipe truss are assembled on the ground. Hydraulic jack is controlled by computer, and the steel structure is synchronously jacked to the design height. Its main advantage is to transfer high altitude operations to the ground. It greatly reduces the probability of safety accidents, facilitates the tracking, inspection and rectification of construction quality, and ensures the construction progress more effectively. Especially in harsh weather conditions (such as gale, fog, rain and snow, etc.), most of the installation work can proceed as usual, which is incomparable with other conventional installation methods.

With this technology, dozens of projects have been installed.

Yantai Zhangyu Winery Special-shaped grid (bolt ball, welding ball mixed) area: 310,000 square Meters

d1c273bcdc760fe3b5e0d5536716391 (1)
162acd10ae223641dac175b4fe0aa38
69299b588a9e0a3b4d70aca1a7eab2a
6a75c14aa3ca2ebfd18ad756b1d43bb

Computer Controlled Synchronized Lifting (Zhangyu Winery Site)

75b28bf07c4dd3908fc37b08defc745
937af54febca7a266d472a6bd974ceb

Zhangyu Winery Lifting Site

Spherical shell latticed frame (bolted spherical joint) of coal storage yard of a coal preparation

plant in Shuozhou, Shanxi Province, with a bottom diameter of 10400mm

17bd23b76d20b44ff02620e0e76eee6
c6de2a2137dd3d8d4c0c10c138d1960
d006d2d522b52bf42854a893734b671
d7cce07927029e17377eb6fb0803a13

Xiaogan Branch of Hubei Institute of Engineering (Bolted Ball and Welded Ball Mixed)

c6de2a2137dd3d8d4c0c10c138d1960
c6de2a2137dd3d8d4c0c10c138d1960

Xiaogan Branch of Hubei Institute of Engineering (Bolted Ball and Welded Ball Mixed)

ecda5aa32de31fd8c528dc2d4a5e098
cb36ea772a77e285a0b59e203fcc133
8613a678361ec79d71648a2a4546e83
e22be057befd68c4bf3f54e30523040
80d37425e3d6eef8b4ac4940c54bf74
1ee2a70fb241a69f7b2530b4ed9d70e
f9b7f7fda9aef34d160148ec8708d6a
a2906d80343516c56e87abea4386934
d78e55e39818487375e7da38f3850d6
42efe188aaefaa31433880207c37805
3e3bc597975704496a31a569579d9d2
2ebb2ac47099d3138c3699947793497

Hot Spring Hall of a Seaside Hotel in Qinhuangdao (three-storey grid, bolt ball and welding ball mixed)

c1b1b74949d1fdfec1ac5b684a37588
2b08119fccbbe7d132435e987ac06cf
d078fb732011b82f481a1fb3c3e03e4
a261a85d807682a68944fb05784c593
4bf426ebc209b93438808565407e21c

Dolphin Hall (Mixed) in Dragon Dream Paradise, Taihu Lake, Changxing, Zhejiang Province

Dry Coal Shed of Taizhou No.2 Thermal Power Plant in Zhejiang Province

On-site photos of Taizhou Power Plant

1. General situation of the project:

The roof load-bearing structure of the steel grid of the pole coal shed of Taizhou No. 2 Power Plant in Zhejiang Province is composed of four-corner stacking shell, double-layer bolt ball and welded ball (mainly welding ball, accounting for 85%). The length of the grid is 120 meters and the span is 111.000 meters. The arch is 37.715 meters high and the grid is 3 meters thick. Two rows of supports are arranged on both sides of the length direction. See the following picture: