Bangladesh Glass And Aluminium Plastic Panel Curtain Wall System

Short Description:

The training hall, comprehensive gymnasium and swimming pool of Mine University all adopt truss structure. The total floor area is 19 000 square meters. The roof is made of aluminium, magnesium and manganese, and the wall is made of glass and aluminium veneer curtain wall. glass and aluminium plastic plate curtain wall system new design product aluminum curtain wall steel dome structure building… II. Use of Trusses In Buildings Trusses are used in a broad range of buildings, mainly where ...


  • Min.Order Quantity: 100 Piece/Pieces
  • Supply Ability: 10000 Piece/Pieces per Month
  • Product Detail

    Product Tags

    The training hall, comprehensive gymnasium and swimming pool of Mine University all adopt truss structure. The total floor area is 19 000 square meters. The roof is made of aluminium, magnesium and manganese, and the wall is made of glass and aluminium veneer curtain wall.

    glass and aluminium plastic plate curtain wall system

    glass and aluminium plastic plate curtain wall system
    new design product aluminum curtain wall steel dome structure building...

    new design product aluminum curtain wall steel dome structure building…

    II. Use of Trusses In Buildings

    Trusses are used in a broad range of buildings, mainly where there is a requirement for very long spans,

    such as in airport terminals, aircraft hangers, sports stadium roofs, auditoriums and other leisure buildings.

    steel trusses philippines

    III.The Production Process of Steel Truss

    In order to guarantee the construction period and provide product quality,

    the production of pipe truss needs to go through the following technological process:

    Material preparation – Joining together beforehand – Welding – Correct – Blasting derusting – Spraying

    used steel trusses for sale

    IV. Steel Truss Advantages:

    1.Long span

    2.Lightweight

    3.Reduced deflection (compared to plain members)

    4.Opportunity to support considerable loads.

    design of roofing steel truss

    V. Steel Truss Building Construction Specification

    The advantages of light steel structure :

    1.Economic : quick installed and saving the cost of construction

    2.Reliable quality: mainly produced in the factory and control the quality

    3.big space: the max span of prefab steel structure can reach 80meters

    4.Antiseismic: because the weight is light

    5.Flexible: can be dismantled and enlarged

    6.Beautiful appearance: can use different colors

    7.Long lifespan: can be used more than 50 years

    Main steel frameMaterial: H section steel beam and columns, painted or Hot-dip galvanized
    Secondary frame : Hot-dip galvanized C/Z purlin, steel bracing, tie bar, knee brace, edge cover etc
    Roof panel : EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and PU sandwich panel or Single steel sheet
    Wall panel : Sandwich Panel or Corrugated Steel Sheet
    Tie Rod: Circular Steel Tube
    Brace: Round Bar
    Knee Brace: Angle Steel
    Roof Gutter: Color Steel Sheet or galvanized plate sheet

    Rainspout:

    PVC Pipe
    Door: Sliding Sandwich Panel Door or Rolling Metal Door
    Windows: PVC/Aluminum Alloy Window
    Connecting: High strength bolts
    Packing: There are a steel holder to support all steel members
    Drawing: We can make the design and offer according to your requirement or your drawing

    Galvanized steel pipe truss


  • Previous:
  • Next:

  • Write your message here and send it to us

    Contact Us Now. 100% Customer Satisfaction Guaranteed

    Newsletter
    WhatsApp Online Chat !